Engineering Execution.DeepTech Depth.Advisory Discipline.

TEMROB delivers end-to-end PMC/EPCM for BESS and energy storage programs—from design through commissioning—within an institutional framework of systems engineering discipline, risk-based governance, and investor-grade reporting.

PMC/EPCMBankabilityGrid ComplianceQA/QCHSEVendor QualificationChange ControlCommissioning Readiness
Explore
Turnkey Program

Three Core Pillars

Integrated governance architecture covering all phases of BESS delivery.

Design Authority

Design Authority & Systems Engineering

Requirements and interface management, grid compliance controls, and traceable decision architecture.

  • Requirements & interface management (EMS/PCS/BMS/SCADA)
  • Grid compliance controls and acceptance criteria framework
  • Traceable assumptions and decision set (Decision Log)
Delivery Office

Delivery Governance (PMC/EPCM)

Integrated project management, procurement governance, and site quality assurance architecture.

  • Integrated WBS + IMS and cost model
  • Procurement governance and vendor qualification
  • QA/QC + ITP site verification architecture
Commissioning

Commissioning & Handover

FAT/SAT protocols, performance tests, and O&M readiness for secure transition.

  • FAT/SAT protocols and performance tests
  • Commissioning readiness and acceptance packages
  • O&M readiness: documentation, training, warranty framework
Signature Feature

Delivery Control Map

Governance architecture covering all control points from scope to reporting.

01
Scope Definition
02
Interface Management
03
Controls
04
Gate Review
05
Deliverables
06
Reporting
Trust Engine

Artifact Explorer

Deliverable evidence produced at each gate, tied to acceptance criteria, traceable.

Methodology

Proven Delivery Process

Controlled delivery with defined inputs, outputs, and gate criteria at each step.

1

Discover

Discover
Inputs:

Project definition, stakeholder expectations, existing documentation

Outputs:

Scope document, interface list, assumption set

GateScope freeze
2

Diagnose

Diagnose
Inputs:

Scope document, technical spec, site data

Outputs:

Risk register, gap analysis, mitigation plan

GateRisk review
3

Design

Design
Inputs:

Approved scope, grid requirements, OEM selection

Outputs:

FEED package, IMS baseline, cost baseline

GateFEED approval
4

Deliver

Deliver
Inputs:

Approved design, procurement contracts, ITP

Outputs:

Installation, FAT/SAT, commissioning readiness

GateSAT acceptance
5

Govern

Govern
Inputs:

Commissioning report, punch list, O&M package

Outputs:

Handover file, warranty framework, operational transition

GateFinal acceptance
Hand-over Moment

Delivery model that turns capital into field, risk into governance.

TEMROB drives your BESS investments to success with institutional-grade governance architecture and traceable delivery framework.

Gate-based delivery governance
Traceable artifact set
Investor-grade reporting
Risk-based project management

Why TEMROB?

5D
Discover-Govern Process
8+
Artifact Categories
100%
Traceability